Benefits:
Independent of control maker (Sinumerik, Fanuc, UniPro, Heidenhain, Esab, Mazak …)
Machine connection by serial interface
No interference in controller (PLC) required
Wireless connection (WLAN) to company’s network
Informationsbereitstellung im Browser (Client-seitig softwareunabhängig)
Analysis and actions possible through internet
Analysis related to times, machines or users

Please have a look at the analysises and follow next scenarios:
Compare utilisation ratio of the machines related to a random time window
Compare cycle times for the same workpiece at different machines
Compare idle times for the same workpiece with different tooling
Compare overview related to waiting times (f.i. hoist, basic materials, etc.)
Message at “Free Capacity” or “Waiting Time”
...


Example:
Why do different operators produce different numbers of pieces
with the same machine and programs?
→ Workpiece change times are much higher with operator 2 than with operator 1.
This doesn’t necessarily mean that this is intentionally -
but determining and acting is important.

Operator 1 (one shift) Operator 2 (one shift)
Operator 1 takes the finished
Workpiece from the machine
put in a new Part
presses "START"
then clean the last
manufactured workpiece, while the
new one is already processed
→ optimal timing
Operator 2 takes the finished
Workpiece from the machine
cleans the finished workpiece
put in a new workpiece
presses "START"


wait until the new part is finished

Example calculation:
for one machine for one shift and a pure processing time of 4 min 12 sec per unit

Operator 1 (one shift) Operator 2 (one shift)
Average workpiece change time: 2 minutes
71 workpieces
Cycle time total 293 minutes
Workpiece change time total 142 minutes
Utilisation ratio 67%
Average workpiece change time: 3 minutes
61 workpieces
Cycle time total 251 minutes
Workpiece change time total 183 minutes
Utilisation ratio 58%

Final result:
10 workpieces less per shift
50 workpieces less per week
200 workpieces less per month

Savings:
Up to 3 shifts per month
At a machine tarif of 60 euro per hour and 7.25 working hours per shift,
this leads to an amount of about 1,300.- euro per month and per machine